Los planes,
programas y proyectos 2011
|
OBRAS TERMINADAS |
INVERSION
2011 |
|
DESCRIPCION DE
LOS TRABAJOS |
CONTRATO MAS
CONVENIO |
1ER. TRIMESTRE |
2DO. TRIMESTRE |
3ER. TRIMESTRE |
4TO. TRIMESTRE |
STATUS |
| |
|
|
|
|
|
|
|
REPOSICION
RED DE AGUA POTABLE Y 167 TOMAS EN CALLES ZACATECAS, SINALOA
Y DURANGO DE LA COL. BELLAVISTA, CALLE ATILANO BARRERA/H. DE
NACOZARI Y A. SERDAN DE LA COL. BORJA, CALLE FCO. I. MADERO/JUAREZ
Y CUAHUTEMOC DE LA ZONA CENTRO Y EN BLVD. FELIPE PESCADOR DE
LA COL. H. DE NACOZARI, DE LA CD. DE FRONTERA, COAHUILA. |
$1,670,851.97 |
$223,558.15 |
|
|
|
TERMINADA |
|
REPOSICION
DE SUBCOLECTOR Y 66 DESCARGAS EN CALLE LIBERTAD ENTRE CALLES
COAHUILA Y JUAREZ, Y ATARJEA CON 61 DESCARGAS EN CALLE
ALMADEN ENTRE LIBERTAD Y SONORA, DE LA ZONA CENTRO DE
FRONTERA, COAHUILA. |
$1,925,532.00 |
$78,501.46 |
|
|
|
TERMINADA |
|
CONSTRUCCION
DE LINEA DE AGUA POTABLE DE 8"Ø, DE LA COL. FLORES TAPIA A
LAS COLONIAS MONCLOVA 400 Y CORDOVA, EN LA CD. DE MONCLOVA
COAH. |
$817,757.37 |
$84,656.55 |
|
|
|
TERMINADA |
|
ADQUISICION
DE MEDIDOR PARA AGUA POTABLE DE 15 MM. CONEXIONES DE
1/2",MATERIAL POLIETILENO DE ALTA DENSIDAD |
$2,772,400.00 |
$831,720.00 |
|
|
|
TERMINADA |
|
REPOSICION
RED DE AGUA Y 191 TOMAS EN CALLE VALPARAISO/ QUERETARO Y
BLVD. PAPE, CALLE BRASILIA/REP. DEL SALVADOR Y URUGUAY,
CALLE BRASILIA/BRASIL Y MOCTEZUMA, CALLE WASHINGTON/TORREON
Y PUEBLA, CALLE RIO DE JANEIRO/FRONTERA Y PUEBLA, CALLE
BARRANQUILLA/ZACATECAS Y DURANGO, CALLE BUENOS AIRES/MERIDA
Y PUEBLA Y CALLE JAMAICA/REP. DEL SALVADOR Y AVE. LOS REYES,
TODAS DE LA COL. GUADALUPE, EN LA CD. DE MONCLOVA, COAHUILA. |
$2,247,042.82 |
$129,306.85 |
$243,778.58 |
|
|
TERMINADA |
|
REMODELACION
DE OFICINAS PARA SALA DE ESPERA, CAJAS Y RECEPCION, UBICADAS
EN SIMAS, MONCLOVA, COAHUILA |
$410,785.42 |
|
$30,450.00 |
|
|
TERMINADA |
|
SUMINISTRO DE VALVULAS
REGULADORAS DE PRESION Y CAUDAL |
$3,051,056.94 |
$3,051,056.94 |
|
|
|
TERMINADA |
|
REPOSICION
DE SUBCOLECTOR, ATARJEA Y 10 DESCARGAS EN CALLE PRINCIPAL
ENTRE CALLES NISPEROS Y NOGALES, DE LA COL. SAN MIGUEL |
$451,863.70 |
$113,201.45 |
|
|
|
TERMINADA |
|
CONSTRUCCION
DE TERRAPLEN Y CERCA PERIMETRAL PARA EL AREA DEL TANQUE “V.
CARRANZA” |
$216,722.52 |
$156,362.09 |
|
|
|
TERMINADA |
|
CONSTRUCCION DE LINEA DE
REFUERZO DE 10"Ø, EN CALLE COAHUILA ENTRE CALLES FCO. I.
MADERO Y PTE. CARRANZA DE LA ZONA CENTRO EN LA CD. DE
FRONTERA, COAH. |
$243,235.09 |
$150,928.23 |
$18,121.30 |
|
|
TERMINADA |
|
REMODELACION DEL SEGUNDO PISO
DE SIMAS |
$721,612.04 |
$161,306.69 |
$395,382.79 |
|
|
TERMINADA |
|
ADQUISICION DE 3,000 MEDIDORES
DE FLUJO DE 1/2" DE DIAMETRO |
$816,060.00 |
|
$816,060.00 |
|
|
TERMINADA |
|
CONSTRUCCION DE RED DE AGUA
POTABLE POR CALLE 11, PARA ALIMENTAR A CALLE 28 DE LA COL.
TIERRA Y LIBERTAD |
$39,693.33 |
$39,693.33 |
|
|
|
TERMINADA |
|
REPOSICION Y REUBICACION DE
LINEA DE ATARJEA Y DESCARGAS EN BLVD SAN JOSE ENTRE CALLE
PURISIMA Y LAREDO |
$167,437.93 |
$156,075.16 |
|
|
|
TERMINADA |
|
REPOSICION DE LINEA DE AGUA Y
24 TOMAS DOMICIALIRAS EN CALLE MUTUALISMO ENTRE PROGRESO Y
PIPILA |
$205,447.57 |
$165,472.04 |
$39,975.53 |
|
|
TERMINADA |
|
REPOSICION
DE SUBCOLECTOR 1 Y 37 DESCARGA DOMICILIARIAS EN CALLE
XICOTENCATL ENTRE LAS FLORES Y 2 DE ABRIL Y CALLE LAS FLORES
ENTRE XICOTENCATL Y REFORMA EN LA COLONIA EL PUEBLO |
$38,625.41 |
|
$207,890.18 |
$209,004.53 |
|
TERMINADA |
|
REPOSICION DE ATARJEA Y 31
DESCARGA DOMICILIARIAS EN CALLE BENJAMIN ARGUMEDO, AVENIDA
LOPEZ MATEOS, PROLONGACION BENJAMIN ARGUMEDO, SANTOS
DEGOLLADO, PASEO FRESNO Y LUCIO BLANCO EN LA COLONIA
MIRAVALLE |
$532,318.43 |
|
$339,692.44 |
$257,990.82 |
|
TERMINADA |
|
CONSTRUCCION DE RED DE AGUA
POTABLE Y 11 TOMAS DOMICILIARIAS EN PRIV. MAGNOLIA CON
CALLE LA CRUZ DE LA COLONIA LA SIERRITA |
$97,079.15 |
|
$68,289.39 |
$28,789.76 |
|
TERMINADA |
|
CONSTRUCCION DE RED DE AGUA
POTABLE Y 10 TOMAS DOMICILIARIAS EN CALLE OCAMPO ENTRE
MATAMOROS Y PRIV. ELIZONDO |
$71,743.88 |
|
|
$65,290.31 |
|
TERMINADA |
|
CONSTRUCCION DE RED DE AGUA
POTABLE EN CALLE ANAHUAC ENTRE CALLE BRAVO Y MATAMOROS Z.
CENTRO |
$66,929.05 |
|
|
$61,802.29 |
|
TERMINADA |
|
REPOSICION DE RED DE AGUA
POTABLE BOULEVARD FRANCISCO I. MADERO ENTRE CALLE URUGUAY Y
AVENIDA LOS REYES EN LA COLONIA GUADALUPE |
$377,328.68 |
$113,198.60 |
$218,725.06 |
|
$45,405.00 |
TERMINADA |
|
REPOSICION DE LINEA DE 6" Ø EN
CALLE RIO PANUCO ENTRE RIO NAZAS Y RIO MONCLOVA EN FRCC.
MODERNO |
$156,075.16 |
|
$43,873.44 |
|
$112,201.72 |
TERMINADA |
|
ADQUISICION DE BOMBAS DE
SUMERGIBLES Y TURBINAS PARA LOS DIFERENTES POZOS |
$1,727,018.44 |
|
|
$1,307,748.00 |
$419,270.44 |
TERMINADA |
|
REPOSICION Y CAMBIO DE LINEA
QUE SALE DEL POZO MONCLOVA 2 A LINEA EXISTENTE DE 16” DE
DIAMETRO |
$1,128,198.69 |
|
$699,456.56 |
$198,351.06 |
$230,391.07 |
TERMINADA |
|
construccion de linea de
refuerzo de 14" y 8" en estancias |
$416,288.43 |
|
|
$396,611.03 |
$19,675.55 |
TERMINADA |
|
ADQUISICION DE EQUIPO DE
SUCCION |
$3,828,000.00 |
|
|
|
$3,828,000.00 |
TERMINADA |
|
REPOSICION DE RED DE AGUA
POTABLE Y 92 TOMAS DOMICILIARIAS EN CALLE OCCIDENTAL ENTRE
EMILIO CARRANZA Y 16 DE SEPTIEMBRE DE LA COLONIA OCCIDENTAL |
$549,847.18 |
|
$201,479.32 |
$289,764.19 |
$58,603.67 |
TERMINADA |
|
REPOSICION DE RED DE DRENAJE Y
29 DESCARGAS EN CALLES DE LA PLAZA PRINCIPAL DE FRONTERA |
$580,792.43 |
|
|
$379,838.63 |
$200,953.80 |
TERMINADA |
|
CONSTRUCCION DE CERCA
PERIMETRAL EN TANQUE BORJA |
$580,792.43 |
|
|
$113,883.44 |
$103,722.14 |
TERMINADA |
|
REPOSICION Y REUBICACION DE
ATARJEA EN CALLE FRONTERA Y VALPARAISO CON REPUBLICA DEL
SALVADOR DE LA COLONIA GUADALUPE |
$144,957.89 |
|
|
|
$144,957.89 |
TERMINADA |
|
CONSTRUCCION DE LINEA DE AGUA
EN TANQUE BORJA |
$391,767.64 |
|
|
|
$391,767.64 |
TERMINADA |
|
REPOSICION DE LINEA DE AGUA
OOTABLE Y 23 TOMAS EN AVE. INDUSTRIAL ENTRE PARRAS Y NELLY
CAMPOBELLO COL. INDUSTRIAL |
$203,927.65 |
|
|
|
$189,463.82 |
TERMINADA |
|
REPOSICION DE ATARJEA Y 5
DESCARGAS EN CALLE LUCIO BLANCO ENTRE FRANCISCO MURGIA Y
RAMOS ARIZPE EN FRACC. CARRANZA |
$91,912.44 |
|
|
|
$91,912.20 |
TERMINADA |
|
REPOSICION DE SUBCOLECTOR Y 14
DESCARGAS EN CALLE TLACOPAN ENTRE CUAUHTEMOC Y AVE.
CUAUHTEMOC FRACC. AZTECA |
$310,313.20 |
|
|
|
$302,180.90 |
TERMINADA |
|
REPOSICION
DE LINEA DE AGUA POTABLE Y 47 TOMAS EN CALLE NELLY
CAMPOBELLO ENTRE CALLES FRANCISCO VILLA Y CHIHUAHUA DE LA
COLONIA CAÑADA SUR |
$264,649.35 |
|
|
|
$229,884.99 |
TERMINADA |
|
REPOSICION DE ATARJEA Y 24
DESCARGAS EN CALLE JESUS MUÑOZ ENTRE CALLES MATAMOROS Y
BRAVO DE LA COLONIA EL PUEBLO |
$264,649.35 |
|
|
|
$264,649.35 |
TERMINADA |
|
REPOSICION DE ATARJEA Y 24
DESCARGAS EN CALLE MANUEL ACUÑA ENTRE CALLES MATAMOROS Y
CUAUHTMOC DE LA COLONIA EL PUEBLO |
$348,201.49 |
|
|
|
$348,201.49 |
TERMINADA |
|
REPOSICION DE AGUA POTABLE Y 29
TOMAS EN CALLE LA CRUZ ENTRE CALLES PORFIRIO DIAZ Y SONORA
DE LA COLONIA LA SIERRITA |
$348,201.49 |
|
|
|
$285,496.60 |
TERMINADA |
|
REPOSICION DE ATARJEA Y 11
DESCARGAS EN CALLE JUAREZ ENTRE CALLES LA PAZ Y JIMENEZ DE
LA COLONIA EL PUEBLO |
$186,992.73 |
|
|
|
$180,555.00 |
TERMINADA |
|
REPOSICION
DE AGUA POTABLE Y 18 TOMAS EN PRIV. ZARAGOZA CON CALLE
ZARAGOZA EN ESTANCIAS DE SANTA ANA |
$61,502.08 |
|
|
|
$61,502.08 |
TERMINADA |
|
REPOSICION
DE AGUA POTABLE Y 14 TOMAS EN CALLE LIBERTAD ENTRE CALLES
MUZQUIZ Y GUERRERO EN LA ZONA CENTRO |
$138,039.47 |
|
|
|
$137,759.95 |
TERMINADA |
|
REPOSICION Y REUBICACION DE RED
DE AGUA POTABLE Y 130 TOMAS EN CALLE TORNOS Y/O FUNDICION,
DE LA COLONIA INDUSTRIAL |
$356,650.15 |
|
|
|
$303,756.21 |
TERMINADA |
|
REPOSICION
DE AGUA POTABLE Y 14 TOMAS EN CALLE LIBERTAD ENTRE CALLES
MUZQUIZ Y GUERRERO EN LA ZONA CENTRO |
$138,039.47 |
|
|
|
$137,759.95 |
TERMINADA |
|
REPOSICION
Y REUBICACION DE RED DE AGUA POTABLE Y 130 TOMAS EN CALLE
TORNOS Y/O FUNDICION, DE LA COLONIA INDUSTRIAL |
$356,650.15 |
|
|
|
$356,321.93 |
TERMINADA |
|
REPOSICION
DE LINEA DE AGUA POTABLE Y 7 TOMAS EN PRIV. AYUNTAMIENTO
ENTRE GARCIA CARRILLO Y MANUEL ACUÑA COL. OCCIDENTAL |
$35,479.54 |
|
|
|
$35,479.54 |
TERMINADA |
|
REPOSICION
DE LINEA DE AGUA POTABLE Y 45 TOMAS EN AVE. INDUSTRIAL ENTRE
BLVD. HAROLD R. PAPE Y MANUEL M. PONCE, DEL FRACC. BENAVIDES |
$703,075.02 |
|
|
|
$700,001.20 |
TERMINADA |
|
CONTRATADO |
$13,807,247.83 |
$5,341,838.94 |
$1,543,768.20 |
$622,877.71 |
$9,179,874.13 |
|
|
EJECUTADO |
$16,688,358.98 |
|
|
|
|
|
| |
|
|
|
|
|
|
|
OBRAS EN PROCESO |
|
|
|
|
|
|
|
DESCRIPCION DE
LOS TRABAJOS |
CONTRATO MAS
CONVENIO |
1ER. TRIMESTRE |
2DO. TRIMESTRE |
3ER. TRIMESTRE |
4TO. TRIMESTRE |
STATUS |
| |
|
|
|
|
|
|
|
CONSTRUCCION
DE CAJAS PARA OPERACIÓN DE VALVULAS |
$430,084.72 |
|
|
|
|
PROCESO |
|
TELEMETRIA
2º ETAPA EN POZOS Y TANQUE DELOS EJIDOS POZUELOS DE ARRIBA Y
DE ABAJO |
$2,032,859.40 |
|
$1,073,631.20 |
|
|
PROCESO |
|
ESTUDIO DE DIAGNOSTICO Y
PLANEACION INTEGRAL (DIP) |
$1,439,870.17 |
|
|
$816,720.66 |
|
PROCESO |
|
REPOSICION
DE RED DE AGUA POTABLE Y 20 TOMAS DOMICILIARIAS EN CALLE
LAZARO CARDENAS ENTRE CALLES JUAREZ E HINOJOSA DE LA ZONA
CENTRO |
$140,575.71 |
|
$42,172.72 |
|
$63,611.12 |
PROCESO |
|
REPOSICION
Y CAMBIO DE LINEA QUE SALE DEL POZO MONCLOVA 2 A LINEA
EXISTENTE DE 16” DE DIAMETRO |
$1,128,198.69 |
|
$699,456.56 |
$198,351.06 |
$230,391.07 |
PROCESO |
|
CONSTRUCCION
DE COBERTIZO EN POZO SAN JOSE |
$399,043.80 |
$132,645.21 |
$114,054.00 |
|
|
PROCESO |
|
REPOSICION
DE RED DE AGUA Y 29 TOMAS EN CALLES DE LA PLAZA PRINCIPAL DE
FRONTERA |
$458,239.06 |
|
|
$239,397.53 |
$108,288.83 |
PROCESO |
|
CONSTRUCCION
DE GAVIONES Y PAVIMENTO DE CONCRETO EN CALLE PLAN DE
GUADALUPE FRENTE TECHNOTRIM DE LA COL. FCO I. MADERO |
$114,611.13 |
|
|
|
|
PROCESO |
|
REPOSICION
DE LINEA DE 14" Ø EN SALIDA DEL POZO DE VIBORILLAS 7 |
$170,283.67 |
|
|
|
$121,815.52 |
PROCESO |
|
REPOSICION
DE LINEA DE AGUA POTABLE EN CALLES SAN LUIS Y SAN NICOLAS,
HASTA EL TANQUE GUERRERO DE LA COLONIA PEDREGAL DE SAN ANGEL |
$1,155,686.56 |
|
|
|
$976,120.74 |
PROCESO |
|
REPOSICION
DE ATARJEA Y 72 DESCARGAS DOMICILIARIAS EN CALLE JESUS SILVA
ENTRE OCAMPO Y BOULEVARD HAROLD R. PAPE, DE LA ZONA CENTRO |
$651,646.82 |
|
|
|
$648,040.16 |
PROCESO |
|
REPOSICION
DE LINEA DE ATARJEA Y 130 DESCARGAS DOMICILIARIAS EN CALLE
TORNOS Y/O FUNDICION DE LA COLONIA INDUSTRIAL |
$739,090.58 |
|
|
|
$221,727.18 |
PROCESO |
|
REPOSICION
DE LINEA DE AGUA Y 45 TOMAS DOMICILIARIAS EN AVE. INDUSTRIAL
ENTRE MANUEL M. PONCE Y BLVD. PAPE COL. BENAVIDES |
$356,321.93 |
|
|
|
$106,896.58 |
PROCESO |
|
REMODELACION DE OFICINAS EN
AREAS DE COMEDOR, CONTROL DE MERCADO, COMUNICACIÓN SOCIAL,
CULTURA DEL AGUA Y LECTURISTAS |
$354,345.57 |
|
|
|
$312,736.84 |
PROCESO |
|
|
|
|
|
|
|
|
|
CONTRATADO |
$5,570,632.49 |
$132,645.21 |
$1,929,314.48 |
$1,254,469.25 |
$2,789,628.04 |
|
|
EJECUTADO |
$2,061,959.69 |
|
|
|
|
|
| |
|
|
|
|
|
|
|
CONTRATADO |
$19,377,880.32 |
|
|
|
|
|
|
TOTAL EJECUTADO EN EL EJERCICIO
2011 |
$18,750,318.67 |
$5,474,484.15 |
$3,473,082.68 |
$1,877,346.96 |
$11,969,502.17 |
|
| |
|
|
|
|
|
|
|
PAGOS POR TRIMESTRES POR
FACTIBILIDADES Y/O DERECHOS DE INTERCONEXION |
$5,096,670.06 |
$1,319,000.77 |
$1,435,445.67 |
$2,342,223.62 |
|
|
|